Projection model

Public counters from the Battlegrounds stats ledger only — devices, completed runs, and valid passes. Derived fleet economics (MWh, gallons, CO₂, OPEX, CapEx, gain-share) stay N/A until measured energy/water ledgers exist. The planner on the right is a projection calculator, not measured fleet data.

Devices
0
Unique devices that completed a public run
Completed Runs
0
Attested arena completions
Valid Passes
0
Checksum-valid pass outcomes
Ledger Source
—
cloudflare-kv · honest
Continuous Power Relieved
N/A
Not measured — no energy ledger yet
Evaporative Water Conserved
N/A
Not measured — no water ledger yet
CO₂ / DRAM / OPEX / CapEx
N/A
Derived econ blank until measured
Founder Gain-Share Accrued
N/A
Not settled — projection only in planner

Loading attested counts from Battlegrounds stats ledger…

Attested Run Feed
No timer on this browser yet A run appears here after you press Time this machine on the home page. Nothing is invented.
[#] Fleet Projection Modeler
Projection / planning model — not measured fleet data. Slider outputs are what-if scenarios only.
Target Server Cluster Nodes 10,000 servers
Active Heap Workload / Node 64 GB DRAM
Industrial Power Rate $0.115 / kWh
Evaporative Water Cost $5.80 / 1,000 gal
Formula: power from the sliders 18.4 MW
Formula: energy from the sliders 161,184 MWh
Formula: water from the sliders 76.5M Gallons
Formula: carbon from the sliders 62,055 Tons CO2
Formula: not an invoice $18,536,160
Formula: slider × 4.1445, not a chip measurement $35,228,250
Formula: 25% of the slider result Not a wire
$4,634,040 / year
= $386,170 / month · Not an invoice. Not a wire.
Open Master Contract →